{"id":5221,"date":"2024-04-23T12:56:30","date_gmt":"2024-04-23T17:56:30","guid":{"rendered":"https:\/\/www.mbw.com\/?p=5221"},"modified":"2024-04-24T11:27:49","modified_gmt":"2024-04-24T16:27:49","slug":"testimonial-duquaine-concrete-how-the-bullvibe-saved-time-and-labor","status":"publish","type":"post","link":"https:\/\/www.mbw.com\/testimonial-duquaine-concrete-how-the-bullvibe-saved-time-and-labor\/","title":{"rendered":"Testimonial: Duquaine Concrete – How the bullvibe saved time and labor"},"content":{"rendered":"\n

Duquaine Concrete<\/a>, a trusted name in concrete construction since 1995, located in West Bend, Wisconsin, has been putting the MBW BullVibe<\/a> vibratory bull float attachment to the test, and the results are in: increased efficiency and smoother finishes.<\/strong> The BullVibe is a precision-engineered attachment that utilizes adjustable vibration to create a level, uniform finish on concrete surfaces. Adam Hubacek, Project Manager at Duquaine Concrete, highlights how the BullVibe’s features benefit their work:<\/p>\n\n\n\n